The Participatory Green Infrastructure Project (GIZ funded)  is now ready to move into phase 3 after the completion of the design. This project aims to improve living conditions in three disadvantaged areas by developing green infrastructure networks in East Amman. The approach included a participatory design process where the sites’ users were engaged to decide on and design the open spaces.

Engicon will supervise the construction works at the three sites, conduct workshops with GAM, and prepare two publications destined to raise the awareness of both the environmental and social benefits of Urban Green Infrastructure. The construction period is expected to last four months.